Specialist Projects

High-Level Roof Tile Retention System – Hilton London Olympia

Discover how Building Transformation designed and installed a high-level roof tile retention system at the Hilton London Olympia, using rope access, reducing falling-debris risk above busy public areas.

Bespoke Rope Access Strategy, Leak Investigation & Repairs – Hilton London Metropole

Building Transformation developed a bespoke rope access leak investigation and repair strategy, including high-level roof access planning and temporary anchorage systems.

Façade refurbishment and repairs – Merchant Square

Building Transformation has been appointed to complete a large-scale façade refurbishment and repair project at 5 Merchant Square.

Flat Roof Refurbishment and Waterproofing Upgrade – Hilton Birmingham Metropole

Building Transformation completed a large phased flat roof refurbishment and waterproofing upgrade at Hilton Birmingham Metropole.

Steel Bridge Maintenance and Industrial Recoating, Bristol

The project included designing access plans, managing environmental and waste solutions whilst removing failing industrial coatings and recoating the steel structure over a freshwater lake and main road.

specialist heritage façade cleaning – London Marriott, Grosvenor Square

Building Transformation completed a specialist heritage façade cleaning project in Mayfair, London at the London Marriott Grosvenor Square; a prominent hotel characterised by its traditional stone and heritage-style façade.

Targeted Roof Leak Investigation at a Primary School

A two-day roof leak investigation used fluorescent dye, simulated rainfall, thermal imaging and moisture testing to trace persistent water ingress at a primary school.

Roof Condition Survey and Replacement, The Pullman Hotel

Our roof condition survey showed five sections of roof needed replacing with thermal upgrade insulation and a liquid waterproofing system.

Façade Condition Survey & Repairs – Hilton Olympia

We conducted a façade survey using digital defect mapping technology and then actioned the priority façade repairs via abseiling access

Planned Façade Maintenance Programme – Moor House, London

A complete façade PPM of the glazing, aluminium, and stainless steel, including specialist cleaning, leak detection and repair, and replacement of cappings and gaskets.

Welsh slate roof replacement – The British Library

Welsh slate roof replacement and code 7 lead gully repairs to this iconic Grade 1 listed building, in line with Historic England’s requirements.

Heritage Dome Restoration – Hilton Hyde Park

With leaks causing damage to the main dome, a solution was needed to repair, re-coat and ensure the structure was sound.